NEWS

  • HVAC Indoor Pool building

    HVAC Indoor Pool building September, 2018

    The construction, on-site adjustments (commissioning), optimization and delivery of the project 'Energy Upgrade Swimming Pool Psychiko-Athens College' is completed

  • Riding Club air-conditioning system

    Riding Club air-conditioning system September, 2018

    The construction of the innovative geothermal air conditioning system are completed.

1 2 last

record 1 to 2 from 4 records in 2 pages

© All right reserved www.ecmklima.com - Company's address

Powered by Selector connect