ENERGY UPGRADING OF CENTRAL AIR-CONDITIONING SYSTEM OF NOVOTEL ATHENS HOTEL

25 November, 2016

Operation optimization and fundamental upgrading of the central building air conditioning system is summarized as follows:

New main HVAC piping routing.Complete installation on the roof of the building of two new air cooled heat pump chillers of high performance (type Partial Heat Recovery), replacing the old chillers (refrigerant R-22).Chiller plant control system BMS

The new cooling ensured:

smooth operating and improved indoor conditionssimultaneous cooling and heating (4-pipe),

hot water production through heat recovery

reduced maintenance requirements and costs

cooling and heating annual energy cost savings of more than 35%.

Remote control and monitoring

Namely, the replacement of the old chillers with simultaneous appropriate re-adjustment of cooling and heating water distribution, led to optimum operating result with significant energy cost savings.